IPA6 Brimstone firing
Condition 1
The ongoing trials, being conducted using the IPA (Instrumented Production Aircraft) 6 Typhoon, based out of BAE Systems’ Military Air & Information site at Warton, Lancashire, UK, are part of work to integrate the Phase 3 Enhancement (P3E) package for Eurofighter Typhoon, which will also deliver further weapons integration and mission system upgrades.

The P3E package forms part of Project Centurion – the programme to ensure a smooth transition of Tornado GR4 capabilities on to Eurofighter Typhoon for the Royal Air Force.
In total, nine live firings and nine jettison trials will be carried out over coming months, with support from the UK Ministry of Defence, MBDA, QinetiQ, Eurofighter GmbH and the Eurofighter Partner Companies – Airbus and Leonardo.
 
Read more about the successful first firing of Brimstone from Eurofighter Typhoon here:
http://www.baesystems.com/en/article/successful-completion-of-first-live-firing-of-brimstone-missile
12 Default Profile Image
Air sector
Global leaders in Combat Air.