Modular Bridging System

BAE Systems' Modular Brid...

BR90 Bridging system
Our bridging system – used by the British Army – provides the most flexible, rapidly deployable military gap crossing solution in the world. 

BAE Systems designed and built the Modular Bridging System (delivered to the British Army under the BR90 programme) and has provided continual support since it went into service.

The Modular Bridging System is used by soldiers to rapidly undertake assault crossings and restore vital lifelines and military routes.  The all-encompassing design also offers rapid replacement of civilian infrastructure in combat and peacetime disaster relief.

The system is light enough to be transported by air and lifted by helicopter, yet the bridge panels are strong enough to withstand the weight of Main Battle Tanks such as Challenger 2, equivalent to six double decker buses.  During its lifetime, each bridging system is designed to withstand typically 10,000 crossings in its worst case load condition, for both tracked and wheeled vehicles and in extreme military environments.
 

Project Tyro

 

Our specialised and experienced bridging team is now working on upgrading the system to meet the British Army’s needs to 2040 and beyond, as part of the MOD’s Project Tyro.

The project aims to update or replace the MOD’s bridging system to cope with greater loads and to ensure it remains operationally available and effective until 2040.

BAE Systems won the Assessment Phase in January 2016 and now is preparing its bid for the Demonstration & Manufacture phase of the project.
 

Bridging in action

of

Image of a General Support Bridge deploying © BAE Systems plc
Deployment of a General Support Bridge

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)
Image of ABLE © BAE Systems plc
Automotive Bridge Launching Equipment (ABLE) 

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)
Image of Close Support Bridge launching © BAE Systems plc
Close Support Bridge launching

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)
Image of General Support Bridge launching © BAE Systems plc
General Support Bridge launching

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)
Image of Titan vehicle transporting a Close Support Bridge © BAE Systems plc
Titan vehicle transporting a Close Support Bridge

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)
Image of a two-span floating bridge using pontoons © BAE Systems plc
Two-span floating bridge using pontoons

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)
Image of a Bridging Vehicle used to transport bridging components © BAE Systems plc
Bridging Vehicle used to transport bridging components 

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)
Image of Tank Bridge Transporter vehicle © BAE Systems plc
Tank Bridge Transporter vehicle for transporting Close Support Bridges

The images on this site are the property of BAE Systems (Copyright © 2017 BAE Systems. All rights reserved)

 

BAE Systems’ Bridging Capability

 

The versatile package we offer includes a full range of bridges, as well as launch and support vehicles, which provide gap-crossing capability for both wheeled and tracked vehicles.  This is in addition to an ongoing validation programme to achieve a Military Load Classification in excess of 100.
 

Close Support Bridges

 

The Close Support Bridge (CSB) System provides a rapidly emplaced battlefield mobility capability for use in direct fire zones. CSB can be launched or recovered from under armour in less than 2 minutes by the Titan armoured bridge laying vehicle.  Bridge types include:

No.12 Close Support Bridge

  • Launched and recovered by Titan in less than 90 seconds
  • 13.5m long, 12m maximum span and up to 28.5m when used in combination
  • Transportable by Tank Bridge Transporter

No.11 Close Support Bridge

  • Launched and recovered by Titan in less than 90 seconds
  • 16m long, 14.5m maximum span and up to 34.5m when used in combination
  • Transportable by Tank Bridge Transporter

No.10 Close Support Bridge

  • Launched and recovered by Titan in less than two minutes
  • 26m long, 24.5m maximum span and up to 64.5m in combination
  • Transportable by Tank Bridge Transporter

Combination Bridges

  • Up to three No. 12, No. 11 or No.10 can be deployed to provide gap crossing for extended gaps
  • Trestle set available to allow assault bridges to cross deeper wet or dry gaps

 

General Support Bridges


The General Support Bridge (GSB) system provides the British Army with a mobile tactical support bridge which can be rapidly emplaced to operate successfully within the military environment indirect fire zones. It has been designed and validated to the requirements of the Trilateral Design and Test Code for Military Bridging and Gap Crossing.  Bridge types and enhancement kits include:

Single Span General Support Bridge

  • Launched by ABLE in less than 30 minutes at night by a crew of 10
  • 30m maximum span
  • Supported by two Bridging Vehicle load carrying vehicles

Long Span Equipment

  • Enhancement kit to the General Support Bridge
  • Enables bridges up to 56m to be constructed – UK Launch Limit 44m

Two Span Equipment

  • Enhancement kit to the General Support Bridge
  • Enables two-span bridges to be constructed with fixed or floating piers using Pontoons

 

Launch and support vehicles


The Modular Bridging System is deployed, recovered and fully supported by a range of vehicles, all designed and built by BAE Systems and its legacy companies: 

  • Automotive Bridge Launching Equipment (ABLE)
  • Tank Bridge Transporter (TBT)
  • Bridging Vehicle (BV)
  • Titan armoured bridge launcher
     

Bridge Test Facility

 

BAE Systems operates a specialised Bridge Test Facility at our Telford site which allows us to perform both dynamic and static tests on our bridges.  This facility is the only one of its kind in Europe and one of only two worldwide.

This facility gives us the evidence we need to underwrite the safety and performance of our bridge panels as part of the UK MOD’s Project Tyro, which seeks to upgrade their bridging system to meet the customer’s needs.

Image of BAE Systems' Bridge Test Facility © BAE Systems plc

 

Military Bridging for the future

 
In designing a new bridge for the British Army, we have used new technology that actively monitors the fatigue life of the bridge – this lets soldiers see quickly and easily how much life is left in the bridge so gives them complete peace of mind in its safety and effectiveness. We have also used new techniques to offer more protection for the bridge panels against harsh environmental conditions.  We will continue to evolve our bridging systems to ensure they remain the most flexible and practical gap crossing capability available.
 
 

Bridging